       cities and villages. It will be worthwhile  steam vent rate can be reduced maintain-  quick  corrective  actions  for  signifi cant   are observed. It is worthwhile to consider   New  installations  use  electronic  of  electric/steam  heaters  for  energy

       to  consider  mounting  solar  panel  on  ing Dissolved Oxygen (DO) level.  energy conservation.              provision  of  Differential  Pressure  (DP)   chokes.  But  old  installations,  still  conservation.
       public poles and connect 20-30 poles to                                                                       meter  across  selected  fi lter  and  clean   have  conventional  electromagnetic
       electricity grid through inverter for use   EMS  -65: Air  leakage  into  furnace   EMS -70: Cooling water exchangers   periodically to save energy and improve   ballast. Replace them by electronic   EMS 81: Hydrocarbon loss manage-
       of solar electricity.             chamber is one of the major reasons for  get fouled over time, irrespective of its   reliability.                chokes.                        ment in integrated and complex plants of
                                         poor  effi ciency.  Operation  of  furnace  treatment.  Due  to  inbuilt  dirt,  margin                           Use slim LED lights and replace old  refi neries and petrochemicals is impor-
          EMS-61: For an electric power sys-  chamber at slightly positive pressure to  available  in  downstream  equipment  as   EMS-75: In many complex and com-  40-W standard fl uorescent tubes.  tant. To reduce loss of hydrocarbon
       tem,  a  load  of  induction  motors  with  a  reduce air leakage is one of the options.  well as operation at low capacity, such   mercial  establishments,  lighting  load  is   Use timer controls, photo-sensors or  molecule, it is essential to know the areas

       low  power  factor  draws  more  current  Regular inspection and repair of gaskets  fouling is not affecting process and nor-  very high. In such cases, auto-start and   occupancy  detectors  for  lighting  and quantity of loss; fi nd, measure and
       than a load with a high power factor for  of  peep  door  and  manholes  is  good  mally overlooked. Periodic review and   stop of lighting load, based on timer or   circuit control.  manage. Following areas can be consi-
       the same amount of useful power trans-  practice to minimise air leakage.  cleaning of an exchanger is an effective   photo sensors in open space and motion   Use task-based lighting for focused  dered to arrest loss of material:

       ferred. The higher current increases the                           strategy for energy conservation and       sensors in closed space, can save signifi -  lux, instead of one or multiple light   Loss to fl are header;

       energy lost in the distribution system, and   EMS-66: Steam PRDS are designed  reliability improvement.       cant energy.                         in room.                          Emission from storage tanks;
       require larger wires and other equipment.  for  very  high  fl ow,  but  after  optimisa-                                                           Use lighting voltage transformer for   Drainage to process sewers;

       Because of the costs of larger equipment  tion  of  energy  users  normally  fl ow  is   EMS-71: Provision of Variable Feed   EMS-76: Task lighting is the concept   industries  and  commercial  building   Routine and non-routine purge;

       and wasted energy, electrical utilities will  minimised  for  energy  conservation. At  Drives (VFDs) or change of blade angle   to  providing  adequate  light  where   lighting circuit.     Passing  of  PSVs,  CVs  and  manual
       usually charge a higher cost to industrial  lower fl ow, control of pressure and de-  of  fans  for  minimum  required  duty   required, instead of illumination of whole   Segregate  lighting  circuits  for  easy   valves;

       or commercial customers where there is  superheating is not effective. Many times  reduces energy consumption. However,   offi ce  room  or  conference  room.  It  is   switch on and off, based on require-     Start-up and shut-down losses;
       a low power factor. It is good practice to  BFW  passes  lead  to  two-phase  fl ow  for multiple fans, turning off some fans   energy-effi cient to provide task lighting as   ment.     Sampling losses;
       improve power factor by capacitor bank  downstream. In such cases, it is worth-  to meet minimum required load can be   and where required based on illumination   Street  lights  are  a  signifi cant  load.   Fugitive emission from seals, fl anges,


       or integrating synchronous motor load to  while to design PRDS with two control  one of the easiest feasible options.  survey.                     Replace them by LED lights.       glands, etc.;
       electrical network.               valves,  one  for  fi ne  (small)  fl ow  and                                                                      Use  of  electronic  chokes  for  high   Leakage due to holes, cracks, etc.;

                                         other for coarse (large) fl ow.      EMS-72: In any chemical complex,           EMS-77:  Many  workshops  and     pressure  sodium  vapour  (HPSV),   Ship and receipt loss;

          EMS-62:  At  many  locations  in                                air  and  nitrogen  compressors  are       closed  large  halls  need  large  lighting   high  pressure  mercury  vapour   Tanker fi lling loss;

       complex  process,  to  improve  reliability   EMS-67: Boiler blowdowns are kept  designed and operated at fi xed pressure.   load  to  illuminate  it  even  during  day   (HPMV) and halogen lamps.     Transportation loss;
       of  operations,  liquid  is  pumped  two  fi xed by many operators to control Total  These are high power consuming equip-  time. Day lighting load can be reduced   Switch off lights when enough sun-     Losses  due  to  poor  measurement,

       times  using  intermediate  tank.  Some  Dissolved Solids (TDS), iron and silica.  ment.  By  careful  study  of  minimum   signifi cantly  by  providing  light  pipes   light is available.  volume correction, as well as weight
       examples are: pumping of hot and cold  It can be optimised to reduce heat and  pressure  requirement,  operating  pres-  and glass windows to use sun light for                      calculations;
       water  in  chilling  systems;  pumping  of  chemical  losses,  taking  advantage  of  sure of air and nitrogen compressors can   energy saving.    EMS 80: Energy conservation for   Coke  on  spent  catalyst  and  carbon

       liquid from refl ux drum to intermediate  better quality of BFW. It will conserve  be reduced for reducing loss in leakages                      mild  heating.  For  heating  of  space   deposits in process;
       tank and then to fi nal tank; etc. Check  both, energy and water.   as well as reduce energy consumption of       EMS-78:  In  large  complex  plants,  or  water,  electric  or  steam  heater  is   Hydrogen leakage due to diffusion;

       such cases. It is possible to avoid double                         compressors.                               only one pressure level of air and nitrogen  normal practice. Here you need 1KW   Poor effi ciency of heaters, furnace &

       pumping of liquid in many applications.  EMS-68: Many furnaces require de-                                    headers  are  provided.  At  many  loca-  power  for  860  kcal/hr.  Heat  pump  is   boilers; and
                                         coking to reduce tube metal temperature.   EMS-73: Air  compressors  are  pro-  tions, low pressure air and nitrogen are  a  device,  which  can  heat  space  with   Quality  of  crude  feed,  i.e.  non-

          EMS-63:  Fans  are  used  in  many  The frequency of de-coking requirement  vided with intermediate and fi nal knock-  required, which is let down from com-  3-5 coeffi cient of performance and can   hydrocarbons in crude etc.
       applications.  Many  fans  are  provided  varies from few days to several months  out drums to remove moisture. In order   mon  header.  In  such  cases,  providing  provide refrigeration too in difference
       with fan blade angle control system or  based on feed composition and severity  to  reduce  capex,  the  drain  valves  are   two pressure levels of air and nitrogen  space.  Power  requirements  can  be   Professional chemical engineers can
       possibility  of  adjusting  blade  angle  to  of  operation.  There  are  many  possible  fi xed drain with orifi ce or with air trap   by design with intermediate withdrawal  reduced to 20-34%. It is worthwhile to  actively take up the ideas for sustainable
       adjust load. Normally, blade angles are  ways  by  which  coke  formation  takes  to  pass  water.  Based  on  atmospheric   or two different level compressors can  consider usage of heat pump in place  manufacturing.
       not changed, even if plant load or fl ow  place. Careful study and identifying root  humidity, such moisture varies or due to   be energy effi cient options.
       requirement reduces. Signifi cant power  cause, as well as hard and soft changes,  malfunctioning  trap  passes,  leading  to                                          ABOUT THE AUTHOR
       savings  are  possible  by  regular  blade  can increase time between two decokes  loss of pressurised air. It is worthwhile   EMS-79:  India  has  achieved   Mr. Joy Shah is the Founder and Chief Consultant,
       angle adjustment for required duty of fans.  and save energy signifi cantly.  to  consider  knockout  drum  with  level   major energy savings by replacing incan-  Innov8 ProTech Solutions, The Sustainability and Man-
                                                                          control valve to drain water.              descent bulbs by CFLs. Following are   agement Consultant. Formerly, he was Sr. Vice President
          EMS-64:  Deaerator  is  designed  for   EMS-69:  Boiler  and  steam  turbine                               some more initiatives which can further   (Head  - Technical)  at  Reliance  Industries  Ltd.  He  was
       fi x vent rate with an orifi ce to remove  effi ciency reduces over time and again   EMS-74:  Suction  strainer  of  pump   reduce lighting load:   also  a  member  of  the  IIChE  Chemical  Process  Safety,
       non-condensable. In some applications,  regained  after  cleaning  and  periodic  fouls, leading to high differential pres-     In  workshops,  sheds  and  house-  Energy and Environment Committee from 2018 to 2022.
       this vent with orifi ce plate does not have  maintenance.  Some  manufacturers  run  sure. Sometimes it results in cavitation   holds,  use  of  natural  day  lighting   For the last fi ve years, Mr. Shah has been consulting for
       isolation  valves.  Combining  chemical  periodic  boiler  and  turbine  effi ciency  of  pumps  and  damage  it.  Similarly,   saves  energy.  Transparent  roofs,   energy and water management, serving as an advisor for
       and mechanical de-aeration can reduce  maintenance  programmes  to  identify  discharge fi lters also gets fouled and is   larger  glass  windows,  and  light   sustainable manufacturing as well as process safety and risk management.
       oxygen in Boiler Feed Water (BFW) and  root cause of loss of effi ciency and take  cleaned as and when process limitations   pipes are some possibilities.


       188                                                                      Chemical Weekly  April 30, 2024      Chemical Weekly  April 30, 2024                                                                 189


                                      Contents    Index to Advertisers    Index to Products Advertised
   183   184   185   186   187   188   189   190   191   192   193