       LEARNING FROM MISTAKES
       US CSB releases safety video on acetic acid release

       at LyondellBasell’s Texas site in 2021


          The US Chemical Safety and Hazard   a pipe section located between a leaking   The  safety  video  addresses  the  two
       Investigation Board (CSB) has released  pipe and an acetic acid reactor. To do so,  key safety issues identified in the CSB’s
       a new safety video on its investigation  they decided to lock a plug valve in the  final report that contributed to the inci-
       into the fatal release of acetic acid at the  closed position by removing the valve’s  dent: (1) valve design to prevent human
       LyondellBasell  La  Porte  Complex  in  actuator.  However,  LyondellBasell  did  error;  and  (2)  providing  workers  with
       La Porte, Texas, on July 27, 2021, that  not have a procedure detailing how to re-  conditions,  procedures,  and  training  to
       killed two contract workers.      move the actuator, and neither Lyondell-  safely  conduct  work.  The  video  also
                                         Basell nor Turn2 trained the Turn2 per-  highlights safety recommendations made
          Highly  corrosive  acetic  acid  mix-  sonnel on how to remove the actuator.  by the CSB to the American Society of
       ture had erupted from equipment when  Instead, the contractors inadvertently   Mechanical  Engineers,  the  American
       three  contract  workers  inadvertently  removed  pressure-retaining  fasteners  that   Petroleum Institute, and LyondellBasell.
       removed critical components of a plug  were  holding  the  valve  cover  in  place
       valve. All three workers were sprayed  and  should  not  have  been  removed  to   In  the  video,  CSB  Board  Member
       with the acetic acid mixture. Two died  uninstall the actuator. The compromised  Dr. Sylvia Johnson, said, “As this tragic
       from  their  injuries.  The  CSB’s  new  valve failed, and all three Turn2 workers  incident  has  shown  us,  even  a  simple
       safety  video,  called  “Designed  to  fail:  were sprayed by the acetic acid mixture.  task can turn deadly if it is not properly
       Chemical  release  at  LyondellBasell,”                            performed.  It  is  time  to  improve  the
       includes  an  animation  of  the  events   When the CBS’s final investigation  design  of  plug  valves  and  take  other
       leading to the incident, as well as com-  report  was  issued,  CSB  Chairperson  protective actions, such as ensuring that
       mentary  from  CSB  experts.  The  CSB  Mr. Steve Owens had noted that “there  clear markings are visible on all existing
       released its final investigation report on  have been similar incidents around the  plug  valve  pressure-retaining  compo-
       the incident on May 25, 2023. The inves-  country involving plug valves being in-  nents, and workers are properly trained
       tigation found that the incident occurred  advertently taken apart when removing  before  conducting  maintenance.  Vital
       when three contractors from Turn2 Spe-  connected  equipment”  and  urged  that  steps like these can go a long way in
       cialties Companies attempted to isolate  action be taken to address this issue.  injury prevention and help save lives.”

       PROJECT UPDATE
       KazMunayGas, Sibur and Sinopec commit to move

       ahead on Kazakh polyethylene project

          Kazakh  government  owned  oil  &  implementation of the Silleno project.  ruk-Kazyna,  KMG,  Sibur  and  partici-
       gas  company,  KazMunayGas  (KMG),  The  protocol  reflects  the  commitment  pants of the operating companies of the
       Russia’s  Sibur  and  China’s  Sinopec  of the parties to ensure the highest level  petrochemical  projects  signed  the  main
       have  signed  a  protocol  agreement  on  of local content in the field of design,  documents on the creation of joint ven-
       the Silleno (polyethylene, PE) project,  procurement of equipment and materi-  tures – Kazakhstan Petrochemical Indus-
       the KMG press service reported.   als, as well as construction during the  tries (for polypropylene) and Silleno LLP
                                         implementation  of  the  project,  taking  (for PE). In May 2023, an agreement was
          The  document  was  signed  as  part  into  account  economic  and  technical  signed on the entry of Sinopec into the
       of  the  7th  meeting  of  the  Kazakh-  feasibility,” KMG said.   PE project as a full partner, and in April
       Chinese Business Council on the eve of the                         2024  the  company  officially  became  a
       Shanghai  Cooperation  Organization   The project involves the construction  co-founder  with  30%  stake  (KMG  has
       (SCO)  summit  in Astana.  “The  par-  of a PE plant with a capacity of 1.25-mtpa   40% and Sibur, 30%) The estimated cost
       ties confirmed their intention to agree  in the Atyrau region in western Kazakhstan.   of the project is $7.7-bn, and it is expec-
       on the final investment budget for the  In November 2022, the state fund Sam-  ted to be completed in 2028.

       Chemical Weekly  July 23, 2024                                                                  157


                                      Contents    Index to Advertisers    Index to Products Advertised
   152   153   154   155   156   157   158   159   160   161   162